LEAP DATASET SUMMARY
JAPAN Dataset as Prepared for the East Asia Energy Futures/Asia Energy Security Project,
as modified for use in the Japan WWF "Power Switch" Analysis of Energy Futures for Japan
Printout Prepared by:      Lea Prince, Nautilus Institute  
Date Prepared:                3/22/2004      
All data were extracted from LEAP dataset (version "WWF_Japan_11T", dated 1/26/04) prepared for WWF Japan.  LEAP dataset prepared by:  Masami Nakata, Junichiro Oda, Charles Heaps and David Von Hippel -- October, 2003                                      Transformation Data shows results                                      
LEAP TRANSFORMATION DATA
Maximum Capacity Factor
Business As Usual Power Switch
Branch Units 2000 2005 2010 2015 2020 2000 2005 2010 2015 2020
Transformation          
  Transmission & Distribution Electricity          
    Processes          
      Electricity          
  Transmission and Distribution District Heat          
    Processes          
      District Heat Distribution          
  District Heat Production          
    Processes          
      All District Heat as of 2000          
  Electricity Generation          
    Processes          
      Existing Coal Fired %    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00
      New Coal Fired Plants %    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00
      Fluidized Bed Combustion Coal %    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00
      IGCC %    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00
      Existing Oil Fired %    27.00    29.60    32.20    34.80    37.40    27.00    29.60    32.20    34.80    37.40
      New Oil Fired %    30.00    32.00    34.00    36.00    38.00    30.00    32.00    34.00    36.00    38.00
      Cogen Diesel Engine %    65.00    65.00    65.00    65.00    65.00    65.00    65.00    65.00    65.00    65.00
      Combustion Turbine %    75.00    75.00    75.00    75.00    75.00    75.00    75.00    75.00    75.00    75.00
      Large Hydro %    55.00    55.00    55.00    55.00    55.00    55.00    55.00    55.00    55.00    55.00
      Existing Pumped storage hydro %      4.00      4.00      4.00      4.00      4.00      4.00      4.00      4.00      4.00      4.00
      New Pump Storage Hydro %      4.00      4.00      4.00      4.00      4.00      4.00      4.00      4.00      4.00      4.00
      Existing Nuclear %    82.00    80.00    80.00    80.00    80.00    82.00    80.00    80.00    80.00    80.00
      New Nuclear %    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00
      Existing Natural Gas %    51.00    50.80    50.60    50.40    50.20    51.00    50.80    50.60    50.40    50.20
      New Natural Gas %    50.00    54.00    58.00    62.00    66.00    50.00    54.00    58.00    62.00    66.00
      Geothermal %    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00    80.00
      Combined Cycle NG %    70.00    70.00    70.00    70.00    70.00    70.00    70.00    70.00    70.00    70.00
      Cogen Natural Gas Turbine %    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00
      Cogen Natural Gas Engine %    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00
      Fuel Cells %    91.00    75.50    60.00    55.00    50.00    91.00    75.50    60.00    55.00    50.00
      MCFC %  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00
      Wind %    30.00    30.00    30.00    30.00    30.00    30.00    30.00    30.00    30.00    30.00
      Photovoltaics %    20.00    20.00    20.00    20.00    20.00    20.00    20.00    20.00    20.00    20.00
      MSW %    60.00    60.00    60.00    60.00    60.00    60.00    60.00    60.00    60.00    60.00
      Industry Waste %    50.00    50.00    50.00    50.00    50.00    50.00    50.00    50.00    50.00    50.00
      Digestor gas %  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00
      Black Liquor and Wood Wastes %    60.00    60.00    60.00    60.00    60.00    60.00    60.00    60.00    60.00    60.00
      Micro Gas Turbine %  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00
      Other Biomass %    60.00    60.00    60.00    60.00    60.00    60.00    60.00    60.00    60.00    60.00
      Others %  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00
  Municipal Gas          
    Processes          
      Municipal Gas %    85.00    85.00    85.00    85.00    85.00    85.00    85.00    85.00    85.00    85.00
  Oil Refining          
    Processes          
      All Refineries %    85.00    85.00    85.00    85.00    85.00    85.00    85.00    85.00    85.00    85.00
  Coke          
    Processes          
      Metalurgical Coke %    70.00    70.00    70.00    70.00    70.00    70.00    70.00    70.00    70.00    70.00
  LNG Imports          
    Processes          
      Existing Capacity %    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00
      New Capacity %    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00    40.00
  Coal Mining          
    Processes          
      Domestic Coal Mining %    80.00         -           -           -           -      80.00         -           -           -           -  
  Natural Gas Extraction          
    Processes          
      Existing Domestic Gas Extraction %  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00  100.00
  Crude Oil Extraction          
    Processes          
      All Domestic Crude Oil and NGL Production %    90.00    90.00    90.00    90.00    90.00    90.00    90.00    90.00    90.00    90.00